Alongside teaching, I take on consulting and research assignments in engineering geology: landslide mitigation, road and tunnel slopes, hydropower geology and disaster risk.
After the 2021 Melamchi flood
The 2021 flash flood badly damaged the Melamchi Water Supply Project. I worked on its detailed study for the Asian Development Bank, then led work on rainfall thresholds that warn of landslides in the same valleys.
Consulting and research assignments
| Period | Assignment | Role and organisation |
|---|---|---|
| December 2025- May 2026 | Execution of Countermeasure Works for West Landslide Stability for NAGDHUNGA TUNNEL CONSTRUCTION PROJECT For Hazama Ando Corporation. | Chief Technical Advisor, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| Jan 2024- Dec 2025 | Design of Mitigation measures for the ECO landslide for various project for Department of Roads. | Chief Technical Advisor, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| June 2024- December 2024 | Develop rainfall induced landslide thresholds in the Helambu Panchpokhari region of Sindhupalchok and facilitate their incorporation into the forecasting system of the Department of Hydrology and Meteorology (DHM) | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2023- July 2024 | Detail Geo-technical Investigation and Design Mitigation Measure for Road Side Slope Disaster Management of Mahakali Highway (NH66) CH 38+700 (Budhitola, Bhabar), Kailali | Team Leader, Innovative Engineering and Management, Dhobighat, Lalitpur, Nepal |
| December 2023- June 2024 | Detailed study and design of mitigation measures at Jamunedanda and Garjeni Landslides (Ch: 27+800 and 39+300 respectively) of Bhaluwang-Liwang-Rolpa-Darebot Road: NH53 | Team Leader, Innovative Engineering and Management, Dhobighat, Lalitpur, Nepal |
| August 2023 Running | Implementation of slope protection work using soil nailing system at Siwaliks area of FastTrack Road in Chhatiwan, Makawanpur, Nepal in Package No 4, Kumar Construction Pvt. Ltd. | Team Leader, S Consortium and Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| August 2022 to December 2022 | Engineering Geological Mapping, Geotechnical Investigation, Slope Stability analysis and Preparing mitigation plan of unstable slope section of Muglin- Pokhara Road. | Senior Engineering Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| May 2022 to December 2022 | Geohazard Study of Dudhkoshi River Basin. | National Geohazard Expert, Asian Development Bank, Philippines |
| July 2022 | The prefeasibility and Engineering Geology and Geomorphological study of road access tunnel Dang valley to Rapti valley and Bankas Bash of Kapilvastu district to Kalakate of Dang/Arghakhanchi | Senior Engineering Geologist, Gaumukhi Engineering Company, Sanepa, Lalitpur |
| May 2022 | The consulting service for municipal Disaster Risk Reduction Management (DRRM) plan proposed by National Disaster Risk Reduction and Management Authority (NDRRMA). | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| March 2022 to May 2023 | The detailed design and implementation of slope protection work using grid beams and soil nailing system at surge tank area of Mai Beni Hydropower project, Ilam,Nepal | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| December 2021 to December 2022 (and running) | The study on Geotechnical investigation, Engineering Geological and Geotechnical study for Ground water management system installation work at Chhaling land development site, Bhaktapur,Nepal. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| April 2021 to June 2021 | The study on availability of Lime Stones in Sudurpashchim Province and their use for cement industries. Preparation of detailed geological map of Sudurpashchim Province and volume calculation for the extraction of limestones for their use in the production of cement. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2020 | Land Subsidence and Recharge Dynamics Study of Kathmandu Valley. | Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2020 | Preparation of Master and Detailed project Report for River Training works at Bheda Khola in Birgunj Metropolitan city | Environmental expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2020 | Various Geotechnical drilling work in Kathmandu-Terai Madesh FastTrack, | Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| September 2020 to June 2021 | Promoting the participation of decision makers, interaction between local level and provincial level, scoping study of river and its resources to identify deforestation patches and haphazard river trainings, implementation of nature based bio-engineering solution and monitoring of impact of haphazard sand mining in downstream community. | Environment Expert, Himalaya Conservation Group (OXFAM project) |
| Jan 2021 to August 2021 | Landslide Risk Assessment and Risk Reduction Prioritization in Nepal. | National Consultant Landslide Expert, World Bank, Washington DC, USA |
| Oct 2021 to August 2021 | Detail study of Melamchi Water Supply Project after 2021 Melamchi Flood. | National Consultant Geologist, Asian Development Bank, Philippines |
| September 2020 to June 2021 | The Engineering Geological and Geotechnical study along with foundation evaluation in the proposed foundation site of Milk Powder and Processing plant at Hetauda, Makwanpur, Bagmati Province. Overall management of Geotechnical Investigation in the proposed foundation site of Milk Powder and Processing plant at Hetauda. Data interpretation and preparation of final report. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| June 2020 to May 2021 | The Installation of Flexible Rockfall Barrier System above Take-off yard at Gongar, Upper Tamakoshi Hydroelectric Project. Detail engineering design and installation of rock fall barrier system of energy classes (hinge type) TSC-3000-ZD of height 5 m and 136.5 m in length along with gulley nets. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| April 2020 to July 2020 | Preparation of regional geological map of Province no. 5 with detailed occurrence of minerals. Preparation of geological map for 109 local levels. Also, conduction of feasibility study for developing mines and minerals and identification of 8 potential sites for suitable mine development. Determination of appropriate extraction technique and plan for extraction. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| March 2020 | Preparation of Master Plan for Tourism Development in Jugal region, Sindhupalchwok. | Environment Expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| January 2020 to March 2020 | Detailed geological survey, preparation of GIS maps and drawings and identifying quantity of volume extraction of quarry. Also, analysis of technical and economic feasibility analysis. | Engineering Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| December 2019 | Feasibility Study of Industrial Village of Dhading | Environment Expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2019 | Iron and Goldmine in Jawalamukhi-6 Dhading. | Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal |
| November 2019 | Feasibility Study of new Limestone mine site in Province 3 which includes soil sampling, determining grade of limestone, determining reserve estimate of limestone. | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| August 2019 to December 2019 | Responsible determining forest-based, agriculture based, cement based and textile based raw materials available in Province no. 3. Assessment of long-term demand and strategy for supply of raw materials with estimation of quantities along with technical and economic feasibility analysis. | Environmental Expert, Galaxy Services Pvt. Ltd. |
| July 2019 | Consulting Services for Study on Relocation of Air Pollution causing Industry in Kathmandu Valley | Environmental Expert, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| May 2019 | Field Study, Sample collection for waste water management system, Comprehensive study of activated sludge Wastewater Treatment Plant(WWTP) in Guheshwori. | Environmental Expert, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| May 2019 | Feasibility study of Quarry of Stone, Sand and Slate in Selected District of Gandaki Province | Environmental Expert, Geo-Spatial Engineering Solution Pvt. Ltd. |
| May 2019 to July 2019 | Detailed geological survey, preparation of GIS maps and drawing along with identifying quantity of volume extraction. | Team Leader, Geo-Spatial Engineering Solution Pvt. Ltd. |
| April 2019 | Geophysical and Geotechnical Investigation along with 2D ERT survey of Swayambhu Hill. | Team Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| March 2019 | Study and Preparation of Detail Project Report for Paper Industry Establishment from the Investment of Private and Cooperative Sectors in Collaboration with State Government. | Environmental Expert, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| March 2019 | Consulting services for 2D Electrical Resistivity Tomography of Budhigandaki PROK Hydropower Project. | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| March 2019 to July 2019 | Geological investigation and mapping of State no. 3 with identification of potential deposit of metallic and non-metallic mineral for exploration. | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| December 2018 to July 2019 | Geological and geotechnical drilling of total 200 m depth including one-hole maximum depth of 100 m along with ERT, SRT, MASW and slope stability and report preparation. | Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| May 2018 to February 2019 | Train and preparation of 2D ERT for total length of 8,000 m and investigation of depth varying from 60-100 m depending upon the space availability. | Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| February 2018 to April 2018 | Technical support for the project including designs, geotechnical investigations, drawings and structural report. | Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| January 2017 to August 2018 | Geological core drilling work of total depth of 700 m., at Ratu Khola, Bardiwas and geological log and report preparation. | Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| September 2017 to March 2018 | Train parliamentarians of Nepal for formulation of DRR act in Nepal, total 6 trainings. | Principal trainer, Himalaya Conservation Group (OXFAM project) |
| March 2016 to June 2017 | Detailed engineering design and installation of rock fall barrier system for various height including rock drilling of 100 mm dia upto depth of 5m and grouting works. | Project Incharge, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| April 2017 to October 2017 | Train Local leaders of Nepal for formulation of DRR plan in rural municipalities and municipalities of Nepal, total 7 Municipalities as pilot project. | Principal trainer, Himalaya Conservation Group (OXFAM project) |
| March 2017- September 2017 | Core Drilling at Bardiwas, Mahottari for Active Fault exploration | Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal and Nanyang Technical University, Singapore |
| April 2017 | Engineering geological study of penstock alignment of Siti‐2 Hydropower Project for evaluation of rock fall problem, Kyosoweri, Uganda | Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal and VS Hydro (Uganda) |
| Jan 2017 to March 2017 | Geotechnical Assessment of Transmission Tower Site of Hindi village and Flood protection work at power house site for Upper Bhotekoshi Hydropower Project, Sindhupalchowk, Nepal | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| Jan 2017 to Feb 2017 | Geotechnical and geophysical site investigation of Jurassic Resort and Villas, Pokhara, Nepal. | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| August 2016 to May 2017 | Technical support for the project including designs, geotechnical investigations, drawings and structural report. | Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| December 2016 to January 2017 | Identifying the geological and geotechnical characteristics of the slope and design of foundation. | Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal |
| September 2016 to March 2017 | Train Parliamentarians of Nepal for formulation of DRR act in Nepal, total 6 training. | Principal trainer, Himalaya Conservation Group (OXFAM project) |
| July 2016 to November 2016 | Install Rock Fall Protection System for Upper Bhotekoshi Hydropower Project, Sindupalchowk, Nepal | Team Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| May 2016 to July 2016 | Prepare Detail Project Report and Rock Fall Protection System Installation for Upper Bhotekoshi Hydropower Project’s rock fall protection system, Sindupalchowk, Nepal | Team Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| April 2016 to June 2016 | Train and preparation of Landslide Early Warning System in the Achham district. | Team Leader and principal trainer, Himalaya Conservation Group (UNICEF project) |
| October 2015 to March 2016 | Train Parliamentarians of Nepal for formulation of DRR act in Nepal, total 5 training completed. | Principal trainer, Himalaya Conservation Group (OXFAM project) |
| September 2015 to March 2017 | Research activities of Earthquake Research and Design Centre. | Coordinator, Ehime University Japan Satellite Office Kathmandu and Himalaya Conservation Group |
| May 2015 to March 2017 | Detailed engineering design and installation of rock fall barrier system; rock netting with anchor bars with HPN netting of 120 sq. m at Siddhababa, Palpa. | Project Incharge, Geotech Solutions International, Pulchowk, Lalitpur, Nepal |
| December 2015 | Train 12 Australian practitioner engineers about geological and geotechnical issues of Slopes and Landslides at Sydney, Australia on December 13-17, 2015. | Training Coordinator, Industry Essential Singapore and Center for Market Research, Australia |
| August 2015 to November 2015 | Overall climate risks assessment, preparation of Integrated Watershed Management Plan and Assessment for CB-EWS for Sot-Khola Sub-Watershed, Surkhet | Team Leader, CDECF Sindhupalchowk and BNA Nepal (UNDP project) |
| February 2015 to July 2015 | Prepare different GIS maps and VDC profile, superimpose of cadastral layer and risk study and hazard mapping related to flood, landslide and seismicity. | Team Leader, Geo-Spatial Engineering Solution Pvt. Ltd., Koteshwor, Nepal |
| August 2015 to September 2015 | Geotechnical investigation and analysis of Shah Residency in Godavari, Lalitpur, Nepal | Team Leader, Geotech Solutions International |
| June 2015 to July 2015 | Rapid Damage assessment of 11 Buildings in Kathmandu after the Gorkha Earthquake | Team Leader, Geotech Solutions International |
| March 2015 to April 2015 | Prepare Detail Project Report for Siddhababa rock fall protection, Siddhartha Highway, Palpa. | Team Leader, Geotech Solutions International and Trumer Schutbauten Austria |
| May 2014 to October 2015 | Identifying vulnerable sites based on different hazards and developing early warning system for landslide debris flow and floods. Also, mapping of vulnerability and risk. | Team Leader/Engineering Geologist/ Geotech Consultant, Himalaya Conservation Group |
| August 2014 to March 2015 | Overall engineering design, geotechnical investigation, and planning of Liping small hydropower project (16.2 Mega Watt hydropower project) in Sindhupalchowk district, Nepal. | Team Leader, Design Pro-link Pvt. Ltd. Nepal |
| October 2014 to January 2015 | Prepare information booklets, posters, hoarding board, information board and video documentary to aware people and tourists of Mt Everest region about the Imja glacial lake and its possible outburst floods. | Disaster Risk Expert, Krishna Consultancy and climate change project of Department of Hydrology and Meteorology, Government of Nepal (UNDP funded project) |
| July 2014 to August 2014 | Teach geohazard in Himalaya to 20 students of American and Nepali universities. | Professor, SIT Nepal, Geoscience in the Himalaya |
| June 2014 | Deliver information about Himalayan landslide problem to a documentary program of National Geographical Channel and NOVA, USA. | Himalayan Landslide Expert, Sky Door Films, Washington, USA |
| May 2014 to June 2014 | Preliminary study Setidevi Landslide, Nuwakot | Principal Investigator and Engineering Geologist, CERC Nepal, Kupundol, Lalitpur |
| March 2014 | Training Program on Disaster Risk Management, Kathmandu | Trainer, GIZ (Germany) and DP-Net |
| February 2014 | Main responsible to train high level officials in Master Trainers’ Training on Community Based Early Warning System, Sauraha, Chitawan, Nepal | Trainer, Mercy Corp, ActionAid Nepal |
| January 2014 to April 2014 | Preliminary geological investigation and landslide hazard mapping of Badi Gad River, Gulmi. | Engineering Geologist, Geo Consult Nepal, Baneshwor, Kathmandu |
| December 2013 to January 2014 | Preliminary geological and geotechnical investigation of bio-mass energy plant at Hetauda, Lamsure Danda. | Principal Investigator and Engineering Geologist, Devotion Corporation, Guangdong, China |
| July 2013 to August 2013 | Teach geohazard in Himalaya to 20 students of American Universities | Professor, SIT Nepal, Geoscience in the Himalaya |
| September-November 2010 | Community landslide hazard mapping for RCRRP project of UNDP – Nepal | Landslide Expert, CDESP, Chautara, Sindhupalchowk |
| July- October 2010 | Community risk mapping for global climate change project of UNDP – Nepal | Landslide Expert, Adapt Nepal and UNDP Nepal |
| June- July 2010 | Engineering geological field investigation training for engineers and overseers of Kadoorie Agricultural Aid Association | Trainer/Slope Stability Expert, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara |
| May- June 2010 | Landslide susceptibility mapping in Churia Range and evaluation of land degradation. | Landslide expert, Office of President of Nepal and Department of Soil Conservation, Ministry of Forest |
| July – September 2009 | Geological and geotechnical study of Kirnetar-Chhaude Road, Dolkha. | Senior Geo-Engineer, SiDEF and Nepal Engineering and Environmental Consultancy, Sinamanagal |
| July – August 2004 | Bio-engineering Training for engineers of Department of Local Infrastructures Development and Agricultural Roads, Ministry of Local Development. | Geo-Engineer, HEET Consult Pvt. Ltd., Putalisadak |
| May – June 2004 | Detail site investigation of the Machha Khola Suspension Bridge, Gorkha, Nepal | Consultant Engineering Geologist, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara |
| May 2004 | Advance training course on Water Induced Disaster Prevention | Trainer of Bioengineering, Department of Water Induced Disaster Prevention (JICA funded projects), Ministry of water Resources, HMG/Nepal |
| December 2003 | Seven days Bio-engineering Training for engineers, overseers and representatives of Users Groups of different VDC of Palpa district. | Trainer, Local Initiative Support Program (LISP- Helvetas Nepal), Palpa and CEMECA Consultant Pvt. Ltd. |
| November 2003 | Seven days Bio-engineering Training for engineers and overseers of SABIHAA, Japan International Cooperation Agency (JICA) Project. | Trainer, (SABIHAA) HMG/JICA Community Development and Forest/Watershed Conservation Project II, Pokhara, Nepal |
| September 2003 to December 2003 | Engineering and geotechnical Survey, and preparation of detail project report (DPR) of Chokhopani Microhydropower Project (165 kW) at Marpha Mustang, for Swet Bhairab Power Supply Pvt. Ltd. Baluwatar | Team Leader, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu |
| August 2003 | Training on Rural Road Approach conducted for engineers and overseers of RAP (a DFID, UK funded project) and District Development Office, HMG/Nepal. | Trainer, Rural Access Program (RAP)-IDRS, Kathmandu |
| July-August 2003 | Slope Stability Analysis Training for engineers and overseers of Kadoorie Agricultural Aid Association | Trainer/Slope Stability Expert, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara |
| June 2003 to December 2004 | Geographical Information System (GIS) and AutoCad Training for engineers, foresters and overseers already ten packages of training has been completed | Training Coordinator, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu |
| December 2002 | Preparation of Desk Study report of Dudh Khola Hydropower Project, Manag for Swet Bhairab Power Supply (P) Ltd. Baluwatar | Engineering Geologist, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu |
| November 2002 | Train 60 engineers of District Infrastructure Development Office about Geology of Nepal, Aerial Photo Interpretation, Terrain Assessment and Engineering Application | Trainer, Landslide Risk Assessment in the Rural Access Sector Program (Scott Wilson, Duram University, DFID and Tribhuvan University) Jhamsikhel, Lalitpur |
| August 2002 to September 2002 | Preparation of pre-feasibility report for establishment of the Rural University in Nepal | Team Member, Rural Area Development Nepal, Kathmandu |
| May 2002 to July 2003 | Geotechnical Survey, and preparation of Detail Project Report (DPR) of Wind Electricity Development Project (450 kW) at Kagbeni Mustang, for Swet Bhairab Power Supply Pvt. Ltd. Baluwatar | Team Leader, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu |
| March 2002 to April 2002 | Feasibility study of Wind Electricity Development Project (25 MW) at Kagbeni Mustang, for Swet Bhairab Power Supply Pvt. Ltd. Baluwatar | Engineering Geologist, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu |
| July 2001 | Training of Bioengineering, Survey, Design and Estimate for mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal. | Trainer, Nepal Denmark Watershed Management Project (Funded by DANIDA) |
| May 2001 | Trainer’s Training of Bioengineering with Survey, Design and Estimate for Civil Engineer and Forester working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal. | Trainer, Nepal Denmark Watershed Management Project (Funded by DANIDA) |
| March 2001 | Bioengineering Training to Civil Engineers of the Department of Local Infrastructure Development and Agricultural Roads (DoLIDAR) | Trainer, Mountain Risk Engineering Unit, Tribhuvan University |
| September 2000 to October 2000 | Training of Bioengineering, Mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal. | Trainer, Mountain Risk Engineering Unit, Tribhuvan University |
| May 2000 | Training of Bioengineering, Mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal. | Trainer, Mountain Risk Engineering Unit, Tribhuvan University |
| May 2000 | Detail design of Suspension Bridge of Samar Khola at Upper Mustang, Mustang) | Engineering geologist, Multi-Disciplinary Consultant Pvt. Ltd., Kathmandu |
| June 2000 | Soil investigation of sub-station of Nepal Electricity Authority at Gajuri, Dhading for Ahemebad Electricity Co. Ltd., Power Service Division; Contractor of the Seventh Power Project, Nepal Electricity Authority, Nepal. | Engineering geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| July 2000 | Study of Possible Social and Technical Impact of Undergoing Construction Activities on the Uphill Site of the Doodh Pokhari Drinking Water Source to the People of the area including Quality and Quantity of the Source | Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| Aug. 1998 to April 2000 | Overall management of Office and its Engineering Geology related works | Managing Director, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| July, 1999 | Hydrogeological training for Engineers and Overseers at Janakpur, organized by CARE Nepal | Trainer, CARE Nepal and IDRS Pvt. Ltd., Maharajgunj, Kathmandu |
| August 1999 – September 1999 | Detail engineering survey and design of Charaudi – Shyadul (14 Km long) agricultural road of Dhading District. | Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| Sept. 1998 – July, 1999 | Detailed Socio-Economic and Engineering Survey with Design of five suspensions bridges Ghatte Gad (Darchula), Listra Bagar (Bajhang), Kailashmandu (Bajura), Khaniya Ghat (Baglung) and Daram Khola (Baglung) | Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| September 1998 – December 1998 | Detailed Engineering Survey with Design of three suspension bridges, Kanma Gad, Kaya Gad, Bung Gad (Dailekha). | Team Leader, Cosmos Engineering Services, Baneswor, Kathmandu |
| Nov.1998-July 1999 | Geotechnical investigation of 200 bed Emergency and Trauma Center Complex, Bir Hospital, Kathmandu, Nepal. | Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu |
| Dec.1997 – June 1998 | Detailed Socio-Economic and Engineering Survey with Design of three Suspension Bridge, Puima Gad, Kunala Gad and Lode Ghat of Humla, Bajura and Achham District respectively | Engineering Geologist, Nepal Engineering Consultancy (NEC), Min Bhawan, Kathmandu |
| August – September 1997 | Feasibility survey of Gandi Gad Small Hydropower Project, Gandi Gad, Doti District | Engineering Geologist, Water Resource Consultant (WRC), Maitighar, Kathmandu |
| January 1997 | Pre-feasibility study of Simara International Airport (SIA) at Simara, Bara District. Main duty was to conduct geological study | Engineering geologist, Building Design Associates (BDA), Jhamsikhel, Kathmandu |