Alongside teaching, I take on consulting and research assignments in engineering geology: landslide mitigation, road and tunnel slopes, hydropower geology and disaster risk.

After the 2021 Melamchi flood

The 2021 flash flood badly damaged the Melamchi Water Supply Project. I worked on its detailed study for the Asian Development Bank, then led work on rainfall thresholds that warn of landslides in the same valleys.

ClientAsian Development Bank
RoleNational Consultant Geologist, 2021
Follow-onLandslide thresholds for Helambu and Panchpokhari, built into the forecasting of the Department of Hydrology and Meteorology, 2024
PublishedMelamchi flood damage and risk quantification, World Bank Group, 2022

Consulting and research assignments

PeriodAssignmentRole and organisation
December 2025- May 2026Execution of Countermeasure Works for West Landslide Stability for NAGDHUNGA TUNNEL CONSTRUCTION PROJECT For Hazama Ando Corporation.Chief Technical Advisor, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
Jan 2024- Dec 2025Design of Mitigation measures for the ECO landslide for various project for Department of Roads.Chief Technical Advisor, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
June 2024- December 2024Develop rainfall induced landslide thresholds in the Helambu Panchpokhari region of Sindhupalchok and facilitate their incorporation into the forecasting system of the Department of Hydrology and Meteorology (DHM)Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2023- July 2024Detail Geo-technical Investigation and Design Mitigation Measure for Road Side Slope Disaster Management of Mahakali Highway (NH66) CH 38+700 (Budhitola, Bhabar), KailaliTeam Leader, Innovative Engineering and Management, Dhobighat, Lalitpur, Nepal
December 2023- June 2024Detailed study and design of mitigation measures at Jamunedanda and Garjeni Landslides (Ch: 27+800 and 39+300 respectively) of Bhaluwang-Liwang-Rolpa-Darebot Road: NH53Team Leader, Innovative Engineering and Management, Dhobighat, Lalitpur, Nepal
August 2023 RunningImplementation of slope protection work using soil nailing system at Siwaliks area of FastTrack Road in Chhatiwan, Makawanpur, Nepal in Package No 4, Kumar Construction Pvt. Ltd.Team Leader, S Consortium and Geotech Solutions International, Dhobighat, Lalitpur, Nepal
August 2022 to December 2022Engineering Geological Mapping, Geotechnical Investigation, Slope Stability analysis and Preparing mitigation plan of unstable slope section of Muglin- Pokhara Road.Senior Engineering Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
May 2022 to December 2022Geohazard Study of Dudhkoshi River Basin.National Geohazard Expert, Asian Development Bank, Philippines
July 2022The prefeasibility and Engineering Geology and Geomorphological study of road access tunnel Dang valley to Rapti valley and Bankas Bash of Kapilvastu district to Kalakate of Dang/ArghakhanchiSenior Engineering Geologist, Gaumukhi Engineering Company, Sanepa, Lalitpur
May 2022The consulting service for municipal Disaster Risk Reduction Management (DRRM) plan proposed by National Disaster Risk Reduction and Management Authority (NDRRMA).Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
March 2022 to May 2023The detailed design and implementation of slope protection work using grid beams and soil nailing system at surge tank area of Mai Beni Hydropower project, Ilam,NepalTeam Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
December 2021 to December 2022 (and running)The study on Geotechnical investigation, Engineering Geological and Geotechnical study for Ground water management system installation work at Chhaling land development site, Bhaktapur,Nepal.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
April 2021 to June 2021The study on availability of Lime Stones in Sudurpashchim Province and their use for cement industries. Preparation of detailed geological map of Sudurpashchim Province and volume calculation for the extraction of limestones for their use in the production of cement.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2020Land Subsidence and Recharge Dynamics Study of Kathmandu Valley.Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2020Preparation of Master and Detailed project Report for River Training works at Bheda Khola in Birgunj Metropolitan cityEnvironmental expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2020Various Geotechnical drilling work in Kathmandu-Terai Madesh FastTrack,Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
September 2020 to June 2021Promoting the participation of decision makers, interaction between local level and provincial level, scoping study of river and its resources to identify deforestation patches and haphazard river trainings, implementation of nature based bio-engineering solution and monitoring of impact of haphazard sand mining in downstream community.Environment Expert, Himalaya Conservation Group (OXFAM project)
Jan 2021 to August 2021Landslide Risk Assessment and Risk Reduction Prioritization in Nepal.National Consultant Landslide Expert, World Bank, Washington DC, USA
Oct 2021 to August 2021Detail study of Melamchi Water Supply Project after 2021 Melamchi Flood.National Consultant Geologist, Asian Development Bank, Philippines
September 2020 to June 2021The Engineering Geological and Geotechnical study along with foundation evaluation in the proposed foundation site of Milk Powder and Processing plant at Hetauda, Makwanpur, Bagmati Province. Overall management of Geotechnical Investigation in the proposed foundation site of Milk Powder and Processing plant at Hetauda. Data interpretation and preparation of final report.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
June 2020 to May 2021The Installation of Flexible Rockfall Barrier System above Take-off yard at Gongar, Upper Tamakoshi Hydroelectric Project. Detail engineering design and installation of rock fall barrier system of energy classes (hinge type) TSC-3000-ZD of height 5 m and 136.5 m in length along with gulley nets.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
April 2020 to July 2020Preparation of regional geological map of Province no. 5 with detailed occurrence of minerals. Preparation of geological map for 109 local levels. Also, conduction of feasibility study for developing mines and minerals and identification of 8 potential sites for suitable mine development. Determination of appropriate extraction technique and plan for extraction.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
March 2020Preparation of Master Plan for Tourism Development in Jugal region, Sindhupalchwok.Environment Expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
January 2020 to March 2020Detailed geological survey, preparation of GIS maps and drawings and identifying quantity of volume extraction of quarry. Also, analysis of technical and economic feasibility analysis.Engineering Geologist, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
December 2019Feasibility Study of Industrial Village of DhadingEnvironment Expert, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2019Iron and Goldmine in Jawalamukhi-6 Dhading.Team Leader, Geotech Solutions International, Dhobighat, Lalitpur, Nepal
November 2019Feasibility Study of new Limestone mine site in Province 3 which includes soil sampling, determining grade of limestone, determining reserve estimate of limestone.Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
August 2019 to December 2019Responsible determining forest-based, agriculture based, cement based and textile based raw materials available in Province no. 3. Assessment of long-term demand and strategy for supply of raw materials with estimation of quantities along with technical and economic feasibility analysis.Environmental Expert, Galaxy Services Pvt. Ltd.
July 2019Consulting Services for Study on Relocation of Air Pollution causing Industry in Kathmandu ValleyEnvironmental Expert, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
May 2019Field Study, Sample collection for waste water management system, Comprehensive study of activated sludge Wastewater Treatment Plant(WWTP) in Guheshwori.Environmental Expert, Geotech Solutions International, Sanepa, Lalitpur, Nepal
May 2019Feasibility study of Quarry of Stone, Sand and Slate in Selected District of Gandaki ProvinceEnvironmental Expert, Geo-Spatial Engineering Solution Pvt. Ltd.
May 2019 to July 2019Detailed geological survey, preparation of GIS maps and drawing along with identifying quantity of volume extraction.Team Leader, Geo-Spatial Engineering Solution Pvt. Ltd.
April 2019Geophysical and Geotechnical Investigation along with 2D ERT survey of Swayambhu Hill.Team Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
March 2019Study and Preparation of Detail Project Report for Paper Industry Establishment from the Investment of Private and Cooperative Sectors in Collaboration with State Government.Environmental Expert, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
March 2019Consulting services for 2D Electrical Resistivity Tomography of Budhigandaki PROK Hydropower Project.Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
March 2019 to July 2019Geological investigation and mapping of State no. 3 with identification of potential deposit of metallic and non-metallic mineral for exploration.Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
December 2018 to July 2019Geological and geotechnical drilling of total 200 m depth including one-hole maximum depth of 100 m along with ERT, SRT, MASW and slope stability and report preparation.Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal
May 2018 to February 2019Train and preparation of 2D ERT for total length of 8,000 m and investigation of depth varying from 60-100 m depending upon the space availability.Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal
February 2018 to April 2018Technical support for the project including designs, geotechnical investigations, drawings and structural report.Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal
January 2017 to August 2018Geological core drilling work of total depth of 700 m., at Ratu Khola, Bardiwas and geological log and report preparation.Project incharge, Geotech Solutions International, Sanepa, Lalitpur, Nepal
September 2017 to March 2018Train parliamentarians of Nepal for formulation of DRR act in Nepal, total 6 trainings.Principal trainer, Himalaya Conservation Group (OXFAM project)
March 2016 to June 2017Detailed engineering design and installation of rock fall barrier system for various height including rock drilling of 100 mm dia upto depth of 5m and grouting works.Project Incharge, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
April 2017 to October 2017Train Local leaders of Nepal for formulation of DRR plan in rural municipalities and municipalities of Nepal, total 7 Municipalities as pilot project.Principal trainer, Himalaya Conservation Group (OXFAM project)
March 2017- September 2017Core Drilling at Bardiwas, Mahottari for Active Fault explorationSenior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal and Nanyang Technical University, Singapore
April 2017Engineering geological study of penstock alignment of Siti‐2 Hydropower Project for evaluation of rock fall problem, Kyosoweri, UgandaSenior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal and VS Hydro (Uganda)
Jan 2017 to March 2017Geotechnical Assessment of Transmission Tower Site of Hindi village and Flood protection work at power house site for Upper Bhotekoshi Hydropower Project, Sindhupalchowk, NepalTeam Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
Jan 2017 to Feb 2017Geotechnical and geophysical site investigation of Jurassic Resort and Villas, Pokhara, Nepal.Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
August 2016 to May 2017Technical support for the project including designs, geotechnical investigations, drawings and structural report.Senior Engineering Geologist, Geotech Solutions International, Sanepa, Lalitpur, Nepal
December 2016 to January 2017Identifying the geological and geotechnical characteristics of the slope and design of foundation.Team Leader, Geotech Solutions International, Sanepa, Lalitpur, Nepal
September 2016 to March 2017Train Parliamentarians of Nepal for formulation of DRR act in Nepal, total 6 training.Principal trainer, Himalaya Conservation Group (OXFAM project)
July 2016 to November 2016Install Rock Fall Protection System for Upper Bhotekoshi Hydropower Project, Sindupalchowk, NepalTeam Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
May 2016 to July 2016Prepare Detail Project Report and Rock Fall Protection System Installation for Upper Bhotekoshi Hydropower Project’s rock fall protection system, Sindupalchowk, NepalTeam Leader, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
April 2016 to June 2016Train and preparation of Landslide Early Warning System in the Achham district.Team Leader and principal trainer, Himalaya Conservation Group (UNICEF project)
October 2015 to March 2016Train Parliamentarians of Nepal for formulation of DRR act in Nepal, total 5 training completed.Principal trainer, Himalaya Conservation Group (OXFAM project)
September 2015 to March 2017Research activities of Earthquake Research and Design Centre.Coordinator, Ehime University Japan Satellite Office Kathmandu and Himalaya Conservation Group
May 2015 to March 2017Detailed engineering design and installation of rock fall barrier system; rock netting with anchor bars with HPN netting of 120 sq. m at Siddhababa, Palpa.Project Incharge, Geotech Solutions International, Pulchowk, Lalitpur, Nepal
December 2015Train 12 Australian practitioner engineers about geological and geotechnical issues of Slopes and Landslides at Sydney, Australia on December 13-17, 2015.Training Coordinator, Industry Essential Singapore and Center for Market Research, Australia
August 2015 to November 2015Overall climate risks assessment, preparation of Integrated Watershed Management Plan and Assessment for CB-EWS for Sot-Khola Sub-Watershed, SurkhetTeam Leader, CDECF Sindhupalchowk and BNA Nepal (UNDP project)
February 2015 to July 2015Prepare different GIS maps and VDC profile, superimpose of cadastral layer and risk study and hazard mapping related to flood, landslide and seismicity.Team Leader, Geo-Spatial Engineering Solution Pvt. Ltd., Koteshwor, Nepal
August 2015 to September 2015Geotechnical investigation and analysis of Shah Residency in Godavari, Lalitpur, NepalTeam Leader, Geotech Solutions International
June 2015 to July 2015Rapid Damage assessment of 11 Buildings in Kathmandu after the Gorkha EarthquakeTeam Leader, Geotech Solutions International
March 2015 to April 2015Prepare Detail Project Report for Siddhababa rock fall protection, Siddhartha Highway, Palpa.Team Leader, Geotech Solutions International and Trumer Schutbauten Austria
May 2014 to October 2015Identifying vulnerable sites based on different hazards and developing early warning system for landslide debris flow and floods. Also, mapping of vulnerability and risk.Team Leader/Engineering Geologist/ Geotech Consultant, Himalaya Conservation Group
August 2014 to March 2015Overall engineering design, geotechnical investigation, and planning of Liping small hydropower project (16.2 Mega Watt hydropower project) in Sindhupalchowk district, Nepal.Team Leader, Design Pro-link Pvt. Ltd. Nepal
October 2014 to January 2015Prepare information booklets, posters, hoarding board, information board and video documentary to aware people and tourists of Mt Everest region about the Imja glacial lake and its possible outburst floods.Disaster Risk Expert, Krishna Consultancy and climate change project of Department of Hydrology and Meteorology, Government of Nepal (UNDP funded project)
July 2014 to August 2014Teach geohazard in Himalaya to 20 students of American and Nepali universities.Professor, SIT Nepal, Geoscience in the Himalaya
June 2014Deliver information about Himalayan landslide problem to a documentary program of National Geographical Channel and NOVA, USA.Himalayan Landslide Expert, Sky Door Films, Washington, USA
May 2014 to June 2014Preliminary study Setidevi Landslide, NuwakotPrincipal Investigator and Engineering Geologist, CERC Nepal, Kupundol, Lalitpur
March 2014Training Program on Disaster Risk Management, KathmanduTrainer, GIZ (Germany) and DP-Net
February 2014Main responsible to train high level officials in Master Trainers’ Training on Community Based Early Warning System, Sauraha, Chitawan, NepalTrainer, Mercy Corp, ActionAid Nepal
January 2014 to April 2014Preliminary geological investigation and landslide hazard mapping of Badi Gad River, Gulmi.Engineering Geologist, Geo Consult Nepal, Baneshwor, Kathmandu
December 2013 to January 2014Preliminary geological and geotechnical investigation of bio-mass energy plant at Hetauda, Lamsure Danda.Principal Investigator and Engineering Geologist, Devotion Corporation, Guangdong, China
July 2013 to August 2013Teach geohazard in Himalaya to 20 students of American UniversitiesProfessor, SIT Nepal, Geoscience in the Himalaya
September-November 2010Community landslide hazard mapping for RCRRP project of UNDP – NepalLandslide Expert, CDESP, Chautara, Sindhupalchowk
July- October 2010Community risk mapping for global climate change project of UNDP – NepalLandslide Expert, Adapt Nepal and UNDP Nepal
June- July 2010Engineering geological field investigation training for engineers and overseers of Kadoorie Agricultural Aid AssociationTrainer/Slope Stability Expert, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara
May- June 2010Landslide susceptibility mapping in Churia Range and evaluation of land degradation.Landslide expert, Office of President of Nepal and Department of Soil Conservation, Ministry of Forest
July – September 2009Geological and geotechnical study of Kirnetar-Chhaude Road, Dolkha.Senior Geo-Engineer, SiDEF and Nepal Engineering and Environmental Consultancy, Sinamanagal
July – August 2004Bio-engineering Training for engineers of Department of Local Infrastructures Development and Agricultural Roads, Ministry of Local Development.Geo-Engineer, HEET Consult Pvt. Ltd., Putalisadak
May – June 2004Detail site investigation of the Machha Khola Suspension Bridge, Gorkha, NepalConsultant Engineering Geologist, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara
May 2004Advance training course on Water Induced Disaster PreventionTrainer of Bioengineering, Department of Water Induced Disaster Prevention (JICA funded projects), Ministry of water Resources, HMG/Nepal
December 2003Seven days Bio-engineering Training for engineers, overseers and representatives of Users Groups of different VDC of Palpa district.Trainer, Local Initiative Support Program (LISP- Helvetas Nepal), Palpa and CEMECA Consultant Pvt. Ltd.
November 2003Seven days Bio-engineering Training for engineers and overseers of SABIHAA, Japan International Cooperation Agency (JICA) Project.Trainer, (SABIHAA) HMG/JICA Community Development and Forest/Watershed Conservation Project II, Pokhara, Nepal
September 2003 to December 2003Engineering and geotechnical Survey, and preparation of detail project report (DPR) of Chokhopani Microhydropower Project (165 kW) at Marpha Mustang, for Swet Bhairab Power Supply Pvt. Ltd. BaluwatarTeam Leader, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu
August 2003Training on Rural Road Approach conducted for engineers and overseers of RAP (a DFID, UK funded project) and District Development Office, HMG/Nepal.Trainer, Rural Access Program (RAP)-IDRS, Kathmandu
July-August 2003Slope Stability Analysis Training for engineers and overseers of Kadoorie Agricultural Aid AssociationTrainer/Slope Stability Expert, Kadoorie Agricultural Aid Association, British Gurkhas Nepal, British Army Camp, Pokhara
June 2003 to December 2004Geographical Information System (GIS) and AutoCad Training for engineers, foresters and overseers already ten packages of training has been completedTraining Coordinator, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu
December 2002Preparation of Desk Study report of Dudh Khola Hydropower Project, Manag for Swet Bhairab Power Supply (P) Ltd. BaluwatarEngineering Geologist, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu
November 2002Train 60 engineers of District Infrastructure Development Office about Geology of Nepal, Aerial Photo Interpretation, Terrain Assessment and Engineering ApplicationTrainer, Landslide Risk Assessment in the Rural Access Sector Program (Scott Wilson, Duram University, DFID and Tribhuvan University) Jhamsikhel, Lalitpur
August 2002 to September 2002Preparation of pre-feasibility report for establishment of the Rural University in NepalTeam Member, Rural Area Development Nepal, Kathmandu
May 2002 to July 2003Geotechnical Survey, and preparation of Detail Project Report (DPR) of Wind Electricity Development Project (450 kW) at Kagbeni Mustang, for Swet Bhairab Power Supply Pvt. Ltd. BaluwatarTeam Leader, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu
March 2002 to April 2002Feasibility study of Wind Electricity Development Project (25 MW) at Kagbeni Mustang, for Swet Bhairab Power Supply Pvt. Ltd. BaluwatarEngineering Geologist, HEET Consult Pvt. Ltd., Baluwatar, Kathmandu
July 2001Training of Bioengineering, Survey, Design and Estimate for mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal.Trainer, Nepal Denmark Watershed Management Project (Funded by DANIDA)
May 2001Trainer’s Training of Bioengineering with Survey, Design and Estimate for Civil Engineer and Forester working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal.Trainer, Nepal Denmark Watershed Management Project (Funded by DANIDA)
March 2001Bioengineering Training to Civil Engineers of the Department of Local Infrastructure Development and Agricultural Roads (DoLIDAR)Trainer, Mountain Risk Engineering Unit, Tribhuvan University
September 2000 to October 2000Training of Bioengineering, Mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal.Trainer, Mountain Risk Engineering Unit, Tribhuvan University
May 2000Training of Bioengineering, Mid-level technicians working in Department of Soil Conservation and Watershed Management, Ministry of Forest and Soil Conservation, His Majesty’s Government of Nepal.Trainer, Mountain Risk Engineering Unit, Tribhuvan University
May 2000Detail design of Suspension Bridge of Samar Khola at Upper Mustang, Mustang)Engineering geologist, Multi-Disciplinary Consultant Pvt. Ltd., Kathmandu
June 2000Soil investigation of sub-station of Nepal Electricity Authority at Gajuri, Dhading for Ahemebad Electricity Co. Ltd., Power Service Division; Contractor of the Seventh Power Project, Nepal Electricity Authority, Nepal.Engineering geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
July 2000Study of Possible Social and Technical Impact of Undergoing Construction Activities on the Uphill Site of the Doodh Pokhari Drinking Water Source to the People of the area including Quality and Quantity of the SourceEngineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
Aug. 1998 to April 2000Overall management of Office and its Engineering Geology related worksManaging Director, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
July, 1999Hydrogeological training for Engineers and Overseers at Janakpur, organized by CARE NepalTrainer, CARE Nepal and IDRS Pvt. Ltd., Maharajgunj, Kathmandu
August 1999 – September 1999Detail engineering survey and design of Charaudi – Shyadul (14 Km long) agricultural road of Dhading District.Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
Sept. 1998 – July, 1999Detailed Socio-Economic and Engineering Survey with Design of five suspensions bridges Ghatte Gad (Darchula), Listra Bagar (Bajhang), Kailashmandu (Bajura), Khaniya Ghat (Baglung) and Daram Khola (Baglung)Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
September 1998 – December 1998Detailed Engineering Survey with Design of three suspension bridges, Kanma Gad, Kaya Gad, Bung Gad (Dailekha).Team Leader, Cosmos Engineering Services, Baneswor, Kathmandu
Nov.1998-July 1999Geotechnical investigation of 200 bed Emergency and Trauma Center Complex, Bir Hospital, Kathmandu, Nepal.Engineering Geologist, HEET Consult Pvt. Ltd., Sinamangal, Kathmandu
Dec.1997 – June 1998Detailed Socio-Economic and Engineering Survey with Design of three Suspension Bridge, Puima Gad, Kunala Gad and Lode Ghat of Humla, Bajura and Achham District respectivelyEngineering Geologist, Nepal Engineering Consultancy (NEC), Min Bhawan, Kathmandu
August – September 1997Feasibility survey of Gandi Gad Small Hydropower Project, Gandi Gad, Doti DistrictEngineering Geologist, Water Resource Consultant (WRC), Maitighar, Kathmandu
January 1997Pre-feasibility study of Simara International Airport (SIA) at Simara, Bara District. Main duty was to conduct geological studyEngineering geologist, Building Design Associates (BDA), Jhamsikhel, Kathmandu